26 mm 2 (10 AWG) ground wire must be used, and in all other markets a 6 mm 2 must be used. Each DISTRIBUTION BOX and controller must be grounded. SEC Distribution System extends from the MV (33 kV, 13. 8 kV) feeder outlets of HV / MV Substations down to SEC Customer interface including KWH-Meters and meter boxes. To provide. Abstract: System grounding considerations affect many aspects of an electrical system. The voltage, system arrangement, loads connected, and continuity of. Choose the right box based on environment (indoor/outdoor), load capacity, and durability. During fault conditions, low impedance results in high fault current flow, causing overcurrent protective. THAN 8 FT FROM THE FENCE. THE FENCE SHALL BE GROUNDED SEPARATELY FROM THE GRID UNLESS OTHERWISE NOTED ON THE A PROPRIATE PROJECT DRAWING. SEE APPLICATION "S",THIS DRAWING, FOR REQUIREMENTS FOR HIGH VOLTAGE TOWERS AND PO ES D BY GROUNDING ANALYSIS.